City of DuPont
1700 Civic Drive, DuPont, WA
(253) 964-8121 Fax ~ (253) 964-1455
Statement from Mayor Grayum RE: DRS Audit - June 11, 2013
Street Crack Sealing - June 21st
CITY OF DuPONT
EMPLOYMENT OPPORTUNITY
BUSINESS SERVICES TECHNICIAN
The City of DuPont is now accepting applications for
BUSINESS SERVICES TECHNICIAN. This is a full-time, non-exempt position with a salary range of $ 19.98-$25.44 per hour. Closes June 28, 2013 at 4:00 pm. A complete application packet should include City Application for Employment, resume, and cover letter. Send complete application and requirements to HR, City of DuPont, 1700 Civic Drive, DuPont, WA 98327.
No postmarked applications accepted.
DuPont is currently accepting applications for motivated and career-minded EMS volunteers.
The City of DuPont Fire Department is looking for volunteer EMS Reserves to help staff the Aid Car, assisting with patient care and transport. The reserves will be EMT's who will supplement our career staff and help enable the fire engine to stay in DuPont and staffed during transport situations. Currently, there are fewer private ambulance transport units available to the citizens in DuPont due to growing demand in other areas of the county which absorbs the use of Rural Metro and AMR. DuPont Fire is looking for Washington State EMT's who are willing to volunteer their time serving the citizens of DuPont working side by side with the career firefighters. They will work a minimum of three 12 or 24 hour shifts per month and be supplied with uniforms. They will not participate in suppression activities due to the high cost of uniforms, equipment, and training. Individuals must have a Washington State EMT certification to help staff our Aid Cars, and be able to pass a Washington State Patrol background check
This is a volunteer position, but a small stipend is available. For more information, please contact the Fire Station at 253-964-8414.
Amazon Project Underway in DuPont View Project Camera
Center Drive Construction
Work is slated to begin on Monday, June 3rd on Center Drive for improvements to the box culvert. The majority of the work will occur under Center Drive. Limited lane closures are anticipated to occur, but one lane in each direction will remain open to allow traffic through. There will be no pedestrian access under the Center Drive culvert for the next two weeks during construction. Signs will be posted for the sidewalk closure. Once the culvert is completed, work will begin on the construction of the left turn lane into Creekside Village.
Challenger Soccer Camp: August 5th - 9th



